Changli Xingminweiye Architecture Equipment Co., Ltd.

construction scaffolding

construction scaffolding
Product Detailed

1.save time;
2.save people;
3.save money.

Competitive prices;    

timely delivery;  

rigorous quality control;  

easy to assemble or disassemble.

Working load: 450kg(max);  

They are made from the steel plate and tube.

Good quality in power coating.

Good in the appearance.

Good quality in the steel material.

Our product can be used at least 300 times



Copyright Notice @ 2008-2022 B2BAGE Limited and/or its subsidiaries and licensors. All rights reserved.